Monel K500 Ball Manufacturers and Suppliers

  • Brand: EB
  • Monel K500 Ball Manufacturers and Suppliers
  • Material Grade: Monel K500
  • Surface: bright surface






    Description

    ZAlCu10 High precision Alu Cast Parts EB9090

    Monel K500 Ball Manufacturers and Suppliers

    • Product: Monel K500 Ball
    • Material: Monel
    • Material Grade: Monel K-500
    • Size: According to customer requirements
    • Surface: bright surface
    • Minimum order quantity: 50 pieces
    • Cast Process: Centrifugal Process
    • Certification: ISO9001, PED, SGS etc.
    • Standard: DIN, GB, ISO, JIS, BA, ANSI
    • Delivery Time: 7- 25 days/ To be negotiated
    • Port: Ship from Shanghai Port to the customer’s designated location.
    Chemical Composition:
    Composition (%)CSiMnFeSCuNiAiTi
    Monel 400≤0.30≤0.50≤2.00≤2.5≤0.02428.0~34.0≥63
    Monel K500≤0.10≤0.50≤1.50≤2.0≤0.0127.0~33.063.0~70.02.30~3.150.35~0.86
    Photos for Monel K500 Ball:

    Monel K500 Ball Monel K500 Ball Monel K500 Ball Monel K500 Ball

    Seamless Rolled Ring Quality Control:

    1) Checking the raw material after they reach our factory——- Incoming quality control ( IQC)
    2) Checking the details before the production line operated
    3) Have full inspection and routing inspection during mass production—In process quality control(IPQC)
    4) Checking the goods after they are finished—- Final quality control(FQC)
    5) Checking the goods after they are finished—–Outgoing quality control(OQC)
    Measurement inspection: 100 % self-inspection, 3rd party inspection available

    F&Q:

    Q: Can you manufacture Customization products?
    A: Yes, we can.
    We can produce both standard and special prosucts.
    Our can make them according to your drawings and samples.

    Q: What is your sample policy?
    A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

    Q: What is the Warranty for our products ?
    A: If any quality problems on our side occurred in this period , we will take on the shipping cost and replacement.

    Q: What information do we need to provide to you in order to confirm our parts order?
    A: provide us your drawings or detailed specifications for our technical staff could make the drawing.

    Q: How about your delivery time?
    A: Generally, it will take 7 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

    Trading Terms:
    1. The nearest seaport: Shanghai port
    2. The nearest airport: Shanghai Pudong airport
    3. Payment Terms:L/C,TT,West Union,Paypal
    4. Payment Condition:50% before production, 50% before delivery against complete set of inspection report
    5. Supply Capability:  10,000 tons per year
    6. Sample Availability: yes
    7. Sample Time:15-30 Days
    8. Packing: Plywood Cases or Steel Crates
    9. Delivery time: 45 working days per 20 tons regular castings & forgings
    10. Service: OEM, ODM or Customized

    ZAlCu10 High precision Alu Cast Parts EB9090

    1.  20-year Foundry Operation Experience.
    2. Friendly & High Efficient Technical & Commercial Communication
    3. Professional Export Practices: Exported to +60 Overseas Countries.