Description
KDZ-300 Tunnel Core Engineering Drilling Rig Machine
Product Description:
KDZ-300 tunnel rig is a mechanical vertical shaft engineering core (integrated tower crane) tunnel rig.
It is suitable for underground ventilation, gas extraction and drainage holes, water prevention engineering,
engineering geological drilling, conventional rope core drilling, coal mine Water exploration,
hydropower engineering drilling, dam foundation grouting and drilling, geological survey and blasting drilling, etc.
Main Feature:
1. The transfer case, gearbox and clutch of mature GXY-2 and hydraulic chuck of XY-44A are used. The parts have good versatility.
- Adopt three-chuck clamping system. The upper chuck with automatic shackle can avoid damaging the drill pipe thread when the rig is unloading; the main chuck rotates stably and reliably; drilling upwards, the lower chuck plays a protective role to prevent the drill pipe in the hole from slipping.
- The torque of 4000Nm ensures the implementation of large-diameter (through-hole diameter Φ93mm) and long-distance drilling process. Because the rig is mechanically rotating, the energy of impact start is large, so it has a very good performance when there are accidents in holes such as submerged drills and hold drills.
- The rig has more (8-speed) speed stages and a reasonable speed range. It is suitable for both engineering geological survey and diamond core drilling. It also has two speeds of reversing speed, which is not labor-intensive and safe when dealing with accidents in holes.
- Built-in lifting and rotating device, after a single lifting of the whole machine, it can rotate from 0 to 360 °, and the whole machine can realize three-dimensional drilling at any angle.
- The 4 hydraulic props randomly arranged can realize all-round angle adjustment, and realize safe and fast fixing of the rig.
- In addition to S59, S75, S95, BQ, NQ, and HQ rope drill rigs, rigs are also suitable for Φ50 and Φ60 ordinary wire drill rods.
8. The drilling rig also has a step-by-step walking device, which can move in all directions in conjunction with the lifting and lowering of the rotary oil cylinder, which greatly reduces the labor force.
9. Equipped with tower crane integrated drilling tower (optional for users), users can adjust it according to the size of the underground tunnel, each section is 0.5 meters, and it can also be removed and not used.
10. Compared with the full hydraulic drilling rig, the KDZ-300 tunnel rig has higher transmission efficiency, more convenient maintenance, more affordable price, low use cost and low labor intensity. It is an energy-efficient and economical tunnel rig.
Technical Parameters:
Drilling Capacity | Drill Rod Specifications | Φ50;Φ60;S59;S75;S95;BQ;NQ;HQ Drill Rod | |
Drilling Depth | 300-600m | ||
Basic Parameters | Drilling Inclination | 0~360° | |
Rig Dimensions (L × W × H) | 2415×1800×2285mm | ||
Rig Weight (Including Power) | 2800Kg | ||
Vertical Shaft Through Hole Diameter | Φ93mm | ||
Gyroscope | Vertical Shaft Speed (Power Machine Speed 1470r / min) | Forward Speed | 56;93;154;212;264;458;723;998r/min |
Reverse Speed | 44;207r/min | ||
Vertical Shaft Torque | 4000N·m | ||
Vertical Axis Stroke | 500mm | ||
Maximum Vertical Axis Pressure | 120KN | ||
Lifting Force of Vertical Shaft | 90KN | ||
Maximum Clamping Force of Three Chucks (Upper Chuck, Main Chuck, Lower Chuck) | All are 13t | ||
Ranch | Are 13 tons | ||
Hoist | Maximum Lifting Capacity (Low Speed Single Rope) | 30KN | |
Drum Speed | 37;65;103;141r/min | ||
Wire Rope Lifting Speed (Single Rope) | 0.41;0.73;1.15;1.58m/s | ||
Wire Rope Diameter | Φ16mm | ||
Rope Capacity | 40m | ||
Hydraulic System | Oil Pump Rated Pressure, Rated Displacement | Double Gear Oil Pump 20MPa,25/10ml/r | |
Main Hydraulic Operating System Pressure | 8MPa | ||
Vice Hydraulic Operating System Pressure | 8MPa | ||
Vice Hydraulic Operating System Pressure | 2MPa | ||
Frame | Rig Back Stroke | 350mm | |
Distance From The Rig to the Hole | 200mm | ||
Power Configuration | Motor Y200L-4 | 30KW,1470r/min | |
Drilling Tower (Optional for Users) | Tower Height (Total Height) | 3.7m;4.2m;4.7m (0.5m Per Section, User Optional) | |
Other Parameters | Propulsion Cylinder Stroke Under the Gyrator | 300mm | |
Four Leg Cylinder Travel | 600mm |
Our Photos for KDZ-300 Tunnel Core Engineering Drilling Rig Machine
Our Experience :
- 13 Year Experience in Heat-resistant Steel Field
- 18 Year Expertise in Wear-resistant Material Field
- 20 Year Customer-made High Quality Castings & Forgings
Trading Terms:
- The nearest seaport is Shanghai port
- The nearest airport is Shanghai Pudong airport
- Payment Terms are L/C,TT,West Union,Paypal
- Payment Condition is 50% before production, 50% before delivery against complete set of inspection report
- Supply Capability is 10,000 tons per year
- Sample Availability is yes
- Sample Time is 15-30 Days
- Packing is Plywood Cases or Steel Crates
- Delivery time is about 45 working days per 20 tons regular castings & forgings
- Service is OEM, ODM or Customized
1. 20-year Foundry Operation Experience.
2. Friendly & High Efficient Technical & Commercial Communication.
3. Professional Export Practices: Exported to +60 Overseas Countries.