er70s6 Mig Welding Wire er70s2 Hobart Welding Wire

  • Material : Copper
  • Cast Process: Gravity Process
  • Pattern Process:Metal Dies
  • U.W.:0.5 – 300kg/piece
  • Surface Finish: Appro.Ra6.3 after machining
  • Size Tolerance: CT12






Description

ZAlCu10 High precision Alu Cast Parts EB9090

er70s6 Mig Welding Wire er70s2 Hobart Welding Wire

surface Treatment: copper coated
size: 0.60mm, 0.65mm, 0.70mm, 0.80mm 
packaging: 16kgs/spool; 18kgs/spool
elongation: 15-20%

Chemical composition of er70s6 Mig Welding Wire er70s2 Hobart Welding Wire:
Brazing Wire/Cu-Zn Alloy Brazing Wire/Tin-Brass Brazing Wire
Factory/Brand Equivalent Domestic Brand Chemical composition (%) Material temperature (℃) processing / property
Cu Zn Sn Si Mn Fe Melting Point Recommended
HS221 BCu60ZnSn-R 59~61 Margin 0.8~1.2 0.15~0.35 / / 890-905 910-954 Brazing copper and copper alloys, steel, cast iron, etc, can be brazing flame, furnace welding, induction welding
HL105 BCu58MnZn 57~59 Margin / / 3.7~4.3 0.15 880-910 910-960 Good wettability, good strength and plasticity, suitable for brazing carbide cutting tools and saw blades
FJCuP / Margin Copper based amorphous B, P and Si elements (thickness: 0.025-0.05mm,Width specification 2.7-50mm) 560-640 700-750 Minimum melting point, used for welding precision instruments, circuits and components, contacts, heat exchangers, etc
FJNi-2 BNi-2 Ni-based amorphous B, P and Si elements(thickness specification: 0.025-0.05mm,Width specification 2.7-50mm) 960-990 1040-1100 Used for welding high temperature alloy and stainless steel parts (such as aviation parts, automobile and ship parts, cookware, medical equipment, etc.)
Our er70s6 Mig Welding Wire er70s2 Hobart Welding Wire Photos:
er70s6 Mig Welding Wire er70s2 Hobart Welding Wire
Our Experience:
  • 13 Year Experience in Heat-resistant Steel Field
  • 18 Year Expertise in Wear-resistant Material Field
  • 20 Year Customer-made High Quality Castings & Forgings
 Trading Terms:
  1. The nearest seaport is Shanghai port
  2. The nearest airport is Shanghai Pudong airport
  3. Payment Terms are L/C,TT,West Union,Paypal
  4. Payment Condition is 50% before production, 50% before delivery against complete set of inspection report
  5. Supply Capability is 10,000 tons per year
  6. Sample Availability is yes
  7. Sample Time is 15-30 Days
  8. Packing is Plywood Cases or Steel Crates
  9. Delivery time is about 45 working days per 20 tons regular castings & forgings
  10. Service is OEM, ODM or Customized

ZAlCu10 High precision Alu Cast Parts EB9090

1. 20-year Foundry Operation Experience.
2. Friendly & High Efficient Technical & Commercial Communication.
3. Professional Export Practices: Exported to +60 Overseas Countries.

[carousel_slide id=’765′]