Electric Bike Manufacturers

  • Product: Fitness Electric Bikes
  • Charger: AC 100V-240V Smart Charge
  • Charging time: 2-5 Hours
  • USD: 369 /UNIT
  • Delivery: 95 DAYS
  • MOQ: 1×20FT CONTAINER






    Description

    ZAlCu10 High precision Alu Cast Parts EB9090

    Electric Bike Manufacturers

    Charger: AC 100V-240V Smart Charge
    Charging time: 5-8 Hours
    Throttle: Yes
    Mechanical Components:
    Frame: Steel
    Tyres: 14 Inch
    Saddle: Yes
    Rim: Alloy
    Chain: KMC
    Chain Wheel: Steel
    Rear Rack: Yes
    Saddle: JST
    Packing Information
    Net Weight: 25KG
    Cartion Size:745*410*610
    Container Load: 120 UNITS/20FT 255 UNITS/40FT

    Our Photos for Electric Bike Manufacturers:

    Electric Bike Electric Bike Electric Bike Electric Bike

    Electric Bike Standard Configuration:

    Motor: Brushless 300W Rear motor
    Battery: Lithium Battery 48V 11AH
    Foldable:Yes
    Displayer: LED
    Light: LED Front Light
    Climbing Capacity: 12°
    Brake: FR Disc Brake/RR Disc Brake
    Speed Gears: Single Speed
    Rear Derailleur: No
    Handlebar: Alloy
    Stem: Alloy Foldable
    Phone Holder: Yes

    Max Speed: ≦25KM
    Max Load: 75KG
    Distance Per Charge: ≧55KM

    Electric Bike  Q&A:

    Q: Do you provide free samples?
    A: Yes, usually we provide free samples for testing under the condition of freight paid by customer.

    Q: What is the Warranty for our products ?
    A: If any quality problems on our side occurred in this period , we will take on the shipping cost and replacement.

    Q: Can you manufacture Customization products?
    A: Yes, we can.
    We can produce both standard and special prosucts.
    Our can make them according to your drawings and samples.

    Q: What information do we need to provide to you in order to confirm our parts order?
    A: provide us your drawings or detailed specifications for our technical staff could make the drawing.

    Q: What is the delivery time of your products?
    A: It depends on the inventory availability.If items needed are in stock, the delivery time would be within 7 work days, but if not the delivery time would be around 30 work days.
    We will send working schedule of your order each week.
    Our will inspect and test all merchandise in case of damaging and missing parts before shipment.
    The detailed inspection picturesion by email.

    Trading Terms:
    1. The nearest seaport is Shanghai port
    2. The nearest airport is Shanghai Pudong airport
    3. Payment Terms are L/C,TT,West Union,Paypal
    4. Payment Condition is 50% before production, 50% before delivery against complete set of inspection report
    5. Supply Capability is 10,000 tons per year
    6. Sample Availability is yes
    7. Sample Time is 15-30 Days
    8. Packing is Plywood Cases or Steel Crates
    9. Delivery time is about 45 working days per 20 tons regular castings & forgings
    10. Service is OEM, ODM or Customized

    ZAlCu10 High precision Alu Cast Parts EB9090

    1. 20-year Foundry Operation Experience.
    2. Friendly & High Efficient Technical & Commercial Communication.
    3. Professional Export Practices: Exported to +60 Overseas Countries.