Description
Enquiries for coal-grinding mill liners where deposits, flow restrictions or uneven wear have been reported. Any proposed anti-clogging change requires review of the complete installation.
Describe the deposit or restriction
Identify where material accumulates, when the problem occurs and whether it follows a change in feed. Include available moisture, particle-size and operating records. Photographs before cleaning and the locations marked on a drawing are more useful than the label anti-clogging.
Separate liner fit from process changes
Provide the original liner profile, discharge arrangement, fixing pattern and surrounding clearances. State whether you need a like-for-like replacement or an engineering review of a revised profile. Changes to a coal-handling system need the equipment operator and manufacturer to review their implications.
Define the quotation basis
Specify the current material, mill model, liner position, quantity and inspection requirements. Ask the quotation to identify any proposed departures from the drawing. Reduced buildup or longer life should be evaluated against agreed operating conditions rather than promised from the product name.
Explore related components and enquiry guidance.
Send a drawing-based enquiry
Send the drawing revision, quantities and requested schedule through our contact page or email sales@ebcastworld.com. Telephone: +86 130 9302 3772. The quotation should confirm material, manufacturing scope, inspection and delivery.







